top of page

PETRONAS PENAPISAN (M) SDN BHD, SG UDANG

TASK  : To carry out train opening 1.2mx1.2mx7.0m depth on RC deck by diamond wire for installation & upgrading of bar screen system

Due to the sensitivity and volatility of environment In oil & gas filtration site, All methods applied shall be  sparks free.

The concrete slab opening are accomplished by diamond wire sawing. 

Work  in progress.

The hydraulic diamond coring system is installed to made hole on slab under sea-water.

bottom of page