top of page

TOUCH N GO CORPORATE HQ & HUB, THE SPHERE, U.O.A., BANGSAR SOUTH, KUALA LUMPUR.

To increase floor area by putting up a mezzanine floor using structural steel.  Due to the increase of load, all relevant beams required to increase their load carrying capacity  by using CFRP system. 

​

All structural steel members at fabrication yard.

MR grade 5 ply plywood at fabrication yard.

The air blower is used for ventilation purpose.

Plywood to protect access including lift car

Marking and drilling holes for structural steel bolting system and plywood bolting connection.

Structural steel installation in progress ………………………………………………….

Structural steel installation in progress ………..

Structural steel made staircase No. 1

Prefab steel staircase No. 2.

Preparation of Saturant & CFRP fabric.

CFRP in place.

The hydraulic crane parking on the ground level.

All structural members are  transferred to Level 12 by crane.

bottom of page