top of page
1MG RESERVOIR, GENTING HIGHLANDS
The reservoir had to be completely drained and cleaned by wet sandblasting. Cracks had to be mapped & sealed by pressure injection of low viscosity resin and spalled and porous areas treated with polymer modified repair mortar.
Finally, the total area was protected with a seamless and flexible cementitious waterproofing system.
​



The total surface area – including pillars, was treated with Smart flex after repaired.
bottom of page