top of page
BANGSAR SOUTH COMMERCIAL –HORIZON PHASE 2
Due To The Installation Of Data Room Which Exceed The Design Load Capacity, The Building Design Engineer Request To Upgrade The Load Bearing Capacity By CFRP


Marking on soffit of beam.
To remove existing coating and prepared the substrate.
The rc beam is strengthened by CFRP both flexural and shear.


Working crew is carried out installation of CFRP strictly to manufacturer’s instruction.
bottom of page
